Grease-slick loading docks and mildew-stained masonry aren't just eyesores—they trigger slip incidents and costly OSHA citations. A preventive power-washing calendar keeps facilities safe and compliant.
Loading ramps, dumpster pads, HVAC drip lines and shaded retaining walls build grime fastest. Rank each by risk and visibility.
| Zone | Recommended Cycle |
|---|---|
| Food-grade docks | Monthly |
| Standard docks & aprons | Quarterly |
| Masonry façades | Semi-annually |
| Heavy equipment | Pre-PM shutdown |
Coordinate night or weekend slots. For 24/7 plants, sequence bays so operations aren't halted.
Use berms and vacuum recovery to meet EPA Clean Water Act standards; dispose via approved separators.